Kel-Gor Limited

Heat Recovery Units

Kel-Gor Limited fabricates and installs Heat Recovery Units.

Fabrication and installation was performed for TransAlta (3 units) in Sarnia and Brighton Beach (2 units) in Windsor, Ontario and the Imperial Oil Co-Generation facility at Sarnia.

Trans Alta Sarnia.jpg