Replacement Burner Heads
A focus on the design, fabrication, and installation of a new 28’ diameter, 24’ tall, 400,000 lbs, carbon-steel burner head for Imperial Oil’s Coker project.
Highlights
- Fabrication and Installation of stainless steel plenum and cyclones.
- Fabrication and Installation of a 68” refractory lined overhead line.
- Fabrication and Installation of a stainless steel air grid.
Services Include:
- Fabrication and Installation
- Maintenance